SongMachine Studio Build Update #4

Yep… It took a little while but as of yesterday (Friday, February 23rd 2024) all of the internal framework for the studio is now complete.

This also includes the central wall separating the control room and the recording/live streaming area.

Tasks that are left to be done…

  • Install insulation on ceiling
  • Define power points/finish off electrical work
  • Install control room window
  • Put up walls
  • Set up control room – Hardware
  • Install light fixtures/split system AC

I’m sure I’ve missed some things off the list but hey… We’re all making it up as we go along.

A HUGE thank you to Hen Sweet from Home Sweet Home for doing all of the framing work and also my nephew Cooper who acted as Hen’s helper for all of last week.

It’s all coming together. The light at the end of the tunnel is getting larger and brighter with every day that passes. I’m “Big Kev” excited.

Peace,

Corey 🙂